CDOT Region 2 Critical Culvert Rehabilitation

CDOT Region 2 Critical Culvert Rehabilitation

American West Construction was contracted by the Colorado Department of Transportation to repair culverts at 6 different locations in Walsenburg and Trinidad. Two of the culverts required 48” spincasting work. Three culverts required removal and replacement of the...
Weld County Critical Culvert Lining

Weld County Critical Culvert Lining

Weld County Critical Culvert Lining The project was specified for all three culverts to be either sliplined or CIPP. American West Construction proposed to spincast (CCCP) to minimize impacts to wetlands and reduce the footprint on the surrounding properties which...
Hammer Reservoir

Hammer Reservoir

Hammer Reservoir – Thornton, Colorado American West Construction installed 1900 feet of perforated groundwater drain pipe, six 48 inch drain manholes, and one 72 inch flow meter manhole with electrical, instrumentation and control system. The system included an...
McIntosh Lake

McIntosh Lake

McIntosh Lake – Longmont, Colorado Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet works pipe,...