Trujillo Meadows Dam Outlet Works

Trujillo Meadows Dam Outlet Works

Trujillo Meadows Dam Outlet Works This project included the installation of 385’ of CIPP UV lined culvert including a sand filter diaphragm and heavy dewatering efforts. Additional work on the project included: A slope encasement structure with a staff gauge. Welded...
Hammer Reservoir

Hammer Reservoir

Hammer Reservoir – Thornton, Colorado American West Construction installed 1900 feet of perforated groundwater drain pipe, six 48 inch drain manholes, and one 72 inch flow meter manhole with electrical, instrumentation and control system. The system included an...
Carriage Hills Dam

Carriage Hills Dam

Carriage Hills Dam – Estes Park, Colorado AWC was called upon to reconstruct the Carriage Hills Dam. This project included: New outlet works (concrete encased outfall pipe) Crestwall and grouted riprap (430 CY with bedding) Boulder (265 CY with bedding)...
Bergen Reservoir Construction Project

Bergen Reservoir Construction Project

Bergen Reservoir Construction Project Jefferson County, Colorado This project consisted of rehabilitation of existing earthen dam, and included: Excavation of approximately 50,000 CY Placement of approximately 60,000 CY of embankment Placement of approximately 12,500...