South Adams Way Waterline Improvements
Key components of the installation included multiple restraint joints to ensure system integrity, the installation of gate valves for improved control, and the replacement of three hydrants to enhance fire protection. The existing asbestos waterline was safely abandoned and flow filled to prevent future issues.
In addition to the waterline work, the project included necessary surface restoration. Concrete repairs were made to sidewalks, curbs, gutters, and driveways affected by the installation process. The final phase of the project involved resurfacing with Hot Bituminous Asphalt, applied at a width of 7 feet and a depth of 10 inches.
South Adams Way Waterline Improvements
Location: Centennial, CO
Completion Date: 2024
Client: Willows Water District