Big Dry Creek Parallel Sewer Phase 1

Big Dry Creek Parallel Sewer Phase 1

Big Dry Creek Parallel Sewer Phase 1 This project involved the installation of approximately 4,530 linear feet of 21-inch C900 sewer pipe parallel to an existing sewer to improve the system’s capacity to manage high sewage flows. The scope of work included...
North Dry Gulch Improvements

North Dry Gulch Improvements

North Dry Gulch This project provided a much needed upgrade to the stormwater infrastructure in the floodplain zone near W. Colfax Avenue and W. 14th Ave. in Lakewood, CO. It improved flood protection to handle a 100-year flood event, and improved roadway conditions...
South Adams Way Waterline Improvements

South Adams Way Waterline Improvements

South Adams Way Waterline Improvements This project consisted of a waterline installation and service upgrade in a residential neighborhood in Centennial, CO. To modernizing the local water system, AWC replaced the existing asbestos cement pipes with durable PVC. The...
Sanitary Manhole Repair

Sanitary Manhole Repair

Sanitary Manhole Repair Aurora Water conducted routine inspections and identified hydrogen sulfide damage and concrete corrosion in several manholes within a sanitary sewer system installed in the 1950s. Over time, hydrogen sulfide gas had caused significant...