by americanwestconstruction | Sep 11, 2025
Big Dry Creek Parallel Sewer Phase 1 This project involved the installation of approximately 4,530 linear feet of 21-inch C900 sewer pipe parallel to an existing sewer to improve the system’s capacity to manage high sewage flows. The scope of work included...
by americanwestconstruction | Sep 11, 2025
North Dry Gulch This project provided a much needed upgrade to the stormwater infrastructure in the floodplain zone near W. Colfax Avenue and W. 14th Ave. in Lakewood, CO. It improved flood protection to handle a 100-year flood event, and improved roadway conditions...
by americanwestconstruction | Sep 11, 2025
South Adams Way Waterline Improvements This project consisted of a waterline installation and service upgrade in a residential neighborhood in Centennial, CO. To modernizing the local water system, AWC replaced the existing asbestos cement pipes with durable PVC. The...
by americanwestconstruction | Sep 11, 2025
Sanitary Manhole Repair Aurora Water conducted routine inspections and identified hydrogen sulfide damage and concrete corrosion in several manholes within a sanitary sewer system installed in the 1950s. Over time, hydrogen sulfide gas had caused significant...