Bergen Reservoir Construction Project
Jefferson County, Colorado

This project consisted of rehabilitation of existing earthen dam, and included:

  • Excavation of approximately 50,000 CY
  • Placement of approximately 60,000 CY of embankment
  • Placement of approximately 12,500 TN of riprap and bedding
  • Cleaning, replacement, and extension of toe drains
  • Installation of 24″ HDPE outfall pipe, sluice gate, and concrete outlet work structures
  • Reservoir control and dewatering
  • Dam instrumentation
  • Site reclamation